When you've determined where you need to put your solar LED street light, you want to be sure to have dug the pit correctly at the floor. But how do you get it? Well, there are two potential alternatives for digging the hole.
1. If you go for this excavator, then it might only be going to take approximately 2-3 minutes, and you're finished.
2. The other choice is manually digging the gap by shovel if just one person is doing exactly the job it might take 1 hour to finish the job.
Step 2: Make the concrete foundation kits.
This process needs cement because a proper foundation needs to lay down to hold the street pole firmly.
This process will take approximately 20 minutes if done by one person.
Step 2: Create concrete Base kits
This procedure needs cement since a suitable base should be put down to maintain the road rod carefully. This procedure will take approximately 20 minutes if performed by a single individual.
Step 3: Create the wire connections
The task needs attention, ensuring you are correctly connected all of the wires with all the lights along with the battery. If you are doing it alone, it'll take your 20 minutes.
Step 4: Fix the rod to the base kits
The previous step towards installing a solar or wind LED street light would be to resolve the rod in the base that you've dogged for.
Try to fix the solar street light accurately, because, if in case you do something wrong, you have to do it again.
This procedure is for 5-7 minutes when performed with the support of a crane and two guys. But, if you are going to get it done by hand, then this can take approximately 15-20 minutes.
Besides that, you'll also require at least four to five guys that will give you a hand in installing it correctly. In a nutshell, the entire installation won't take longer than two hours if done correctly and stepwise.
For more details you can contact us.